SOP Generation Skill
Converts voice memos, notes, or transcripts into a structured SOP.
A construction SOP generator that turns voice memos and rough notes into structured, owned, version-controlled process documentation — fast.
Instant download · Works with Claude Pro, Team & Max · 30-day guarantee
Your company runs on tribal knowledge. When a key person leaves, the process walks out with them.
You've tried to document SOPs twice. Both times the doc sat in a Google Drive folder nobody opens.
Nothing has an owner. Nothing has a version. Nothing has a handoff gate.
You can describe the process out loud in 2 minutes but you can't get it onto paper.
This pack turns 2 minutes of voice into a structured SOP with ownership, handoffs, and QA built in.
Converts voice memos, notes, or transcripts into a structured SOP.
Prompts that pull out the steps a expert assumes without saying.
Assigns each step to a role and an accountable owner.
Defines the artifact, approval, or signal that moves work to the next role.
Lightweight versioning that survives without a dedicated tool.
Pre-built index of the 20 SOPs every contractor should have.
Upload the skill file to Claude using the Projects feature. Takes under 5 minutes.
Paste in your situation using the included input template. No technical knowledge required.
Claude returns a structured, consultant-grade deliverable you can act on immediately.
Our lead PM just gave notice and I realized we have nothing written down about how we run a job from kickoff to closeout. I need to document at least 10 core processes before he leaves in 6 weeks.
SOP — JOB KICKOFF (v1.0) Owner: Project Manager · Approver: Director of Ops PURPOSE Move a signed contract into an executable project in under 5 business days. STEPS 1. PM receives signed contract from Sales (Handoff Gate: signed PDF in shared drive). 2. PM creates project in Procore + accounting system within 24 hrs. 3. PM schedules internal kickoff with Estimator, Super, and Controller (day 2). 4. PM publishes baseline schedule and budget (day 4). 5. PM owns Pre-Construction Meeting agenda (day 5). HANDOFF OUT Artifact: Project Charter (template attached). Approver: Director of Ops signs in shared drive. Trigger: Charter signed → Super begins mobilization. NEXT IN LIBRARY → SOP-02: Pre-Construction Meeting → SOP-03: Subcontractor Onboarding
Actual output format. Content varies based on your inputs.
Knows the process exists only in their head.
Talk for 3 minutes, get a real SOP back.
Inherits an undocumented company every Monday morning.
Build a 20-SOP library in weeks, not quarters.
Clients can't operationalize software without documented process.
Hand clients a structured SOP factory.
One-time purchase. Instant download. 30-day guarantee.
A complete construction systems migration plan — move from spreadsheets or legacy tools to a modern operating stack without losing history, momentum, or your team.
A consultant-grade construction technology audit you can run yourself — diagnose your current software stack, eliminate redundant tools, and get a prioritized 90-day replacement roadmap.