Migration Readiness Assessment Skill
Scores your org's readiness across data, process, training, and leadership.
A complete construction systems migration plan — move from spreadsheets or legacy tools to a modern operating stack without losing history, momentum, or your team.
Instant download · Works with Claude Pro, Team & Max · 30-day guarantee
You bought the new system 6 months ago and half the team is still in the old one.
Nobody owns the migration. The implementation partner sent a Gantt chart and disappeared.
Your historical job data lives in Excel files, QuickBooks, and one PM's inbox — and nobody has a plan to move it.
Every time you push for cutover, ops pushes back because "we have a job closing."
This pack gives you the migration architecture your implementation partner didn't — sequencing, ownership, risk, and a go-live readiness gate.
Scores your org's readiness across data, process, training, and leadership.
Field-by-field mapping template with data quality gates.
Communication, training, and incentive plan tailored to your team.
Decides what migrates first, what runs parallel, and what gets sunset.
Role-based training paths with completion checkpoints.
Tracks open risks with owners, mitigations, and trigger conditions.
Upload the skill file to Claude using the Projects feature. Takes under 5 minutes.
Paste in your situation using the included input template. No technical knowledge required.
Claude returns a structured, consultant-grade deliverable you can act on immediately.
We're moving from Excel + QuickBooks to Sage 300 CRE. We have 12 employees, a controller, and two PMs. We want to go live in 90 days. Our biggest fear is losing job history.
MIGRATION PLAN — EXCEL + QB → SAGE 300 CRE (90 DAYS) READINESS SCORE: 62/100 (CAUTION) Top gaps: data quality (45), training plan (40), change comms (55) SEQUENCING (parallel-run model) Days 0–30 Data cleanup + chart of accounts mapping (Controller owns) Days 15–45 Sage configured. Two open jobs run parallel in both systems. Days 30–60 PMs trained on job cost entry. Subcontractor AP migrated. Days 60–75 Historical job data archived (read-only Excel snapshot). Days 75–90 All new jobs created in Sage only. QB closed for new entry. TOP 3 RISKS 1. PM resistance — mitigate with role-based training + paired sessions. 2. Job history "loss" — archive strategy, not migration. Read-only. 3. Go-live during active closeout — block cutover during any job >85% complete. GO/NO-GO GATE — DAY 75 • ≥2 parallel jobs reconciled clean • All PMs completed Tier 1 training • Controller signs off on chart of accounts mapping
Actual output format. Content varies based on your inputs.
Wrote the check for the new system and is watching adoption stall.
A 90-day plan with clear go/no-go gates.
Owns the migration but has no architecture to manage it.
Sequencing, risk register, and readiness scoring out of the box.
Implementations slip because the client lacks internal structure.
Hand the client a real plan, not a Gantt chart.
One-time purchase. Instant download. 30-day guarantee.
A consultant-grade construction technology audit you can run yourself — diagnose your current software stack, eliminate redundant tools, and get a prioritized 90-day replacement roadmap.
A construction SOP generator that turns voice memos and rough notes into structured, owned, version-controlled process documentation — fast.